Real-time and post-processed correction — study guide
The concept's fragments, read in order.
Borrow the error from a receiver that knows where it is
A satellite receiver working alone is off by meters, for reasons that belong to why satellite positions are off: the atmosphere, clocks, orbits, reflections. A mapping aircraft needs its camera positions to a few centimeters. The cure is not a better receiver in the air. It is a second receiver on the ground, sitting on a point whose coordinates are already known.
That second receiver is the base, and the receiver on the aircraft is the rover. A few hundred meters or a few kilometers apart, they hear the same satellites through nearly the same sky, so most of what is wrong with one measurement is wrong with the other in the same way like two neighbors whose clocks both run five minutes fast: if one of them learns the true time and calls the other with the difference, both can subtract the same five minutes. The base compares what it measures with what it knows and the shared error falls out. Strictly, the two receivers' measurements are combined and the rover's position comes out as a measured vector from the base, so its coordinate is the base's coordinate plus that vector. The National Geodetic Survey (NGS) describes the result as relative accuracy on the order of a centimeter.
Two choices shape every job: where the corrections come from (a base you set up yourself, or a network of permanent stations) and when they are applied (during the flight, called real-time kinematic or RTK, or afterwards from logged data, called post-processed kinematic or PPK). Two mistakes ruin either one: a base coordinate that is wrong, and a camera that is not where the antenna is. The services named on this page, such as the NOAA CORS network and OPUS, are run by NGS in the United States; other countries have their own geodetic agencies, networks and rules.
Measuring with the wave instead of the code
An ordinary receiver gets its distance to each satellite by timing a code, a pattern the satellite repeats, and on its own that measurement leaves a position uncertain by meters. Centimeter positioning uses something finer: the radio wave that carries the code. The GPS L1 signal oscillates at 1575.42 MHz, so one cycle of it is about 19 cm long in space (the L2 signal's cycle is about 24 cm). A receiver can tell where within the current cycle the wave is to a small fraction of it, which is millimeters.
The catch is that the wave looks the same from one cycle to the next. The receiver reads the fraction of the last cycle precisely but cannot directly know how many whole cycles lie between the satellite and the antenna like a long tape measure whose fine marks are crisp but whose whole-meter numbers have worn off: you can read the last few centimeters exactly, and still have to work out how many whole lengths came before them. That unknown whole number is the integer ambiguity. The code measurement narrows it to a window, but a window a meter wide still holds several candidate counts of 19 cm cycles, and choosing the wrong one moves the answer by whole cycles.
Solving it is what the base is for. Combining the base's measurements with the rover's cancels clock and hardware errors, and with many satellites on two frequencies only one set of whole numbers fits every measurement at once. Once it is found, the receiver keeps counting cycles as the distances change. If it loses lock on the signal, by flying behind a tree line, say, the count is lost (a cycle slip) and has to be solved again.
Fixed, float, and what the status light means
A correcting receiver reports a solution status, and two words matter. Fixed means the whole-cycle counts to every satellite have been resolved as whole numbers, and the position is good to about a centimeter relative to the base. Float means the counts are still carried as decimals, estimates the receiver has not yet committed to. NGS describes a float solution's precision falling from several meters to under a meter as the receiver works on it. Below float sit the code-only modes, back to the meter level.
NGS's guidance for surveyors is blunt: wait for fixed before collecting anything, and the solution should become fixed in a normal time and stay fixed. Things that knock a receiver out of fixed are the things that interrupt its signals or its corrections: satellites hidden behind trees or buildings, reflections off water or metal, and a correction link that drops. A link that stutters without failing degrades positions too. Regaining a fix is quicker when a few satellites stayed tracked throughout, and slower when the receiver lost everything.
Fixed is the receiver's opinion, not a measurement of the truth. A wrong set of whole numbers can still be reported as fixed, and NGS notes there is no specific warning on screen when it happens; it has recorded height errors of more than 2 dm (8 inches) from wrong fixes caused by reflections. A fix that took unusually long to arrive deserves suspicion. The only proof that the positions were right comes from comparing the finished map with ground points measured independently, which is the business of checking accuracy.
Your own base, or someone else's network
The first way to get corrections is to bring them. A local base is a second receiver on a tripod over a point on or near the site, sending corrections to the aircraft by radio. The distance to the aircraft stays at a few hundred meters, and it works where there is no cell coverage. The costs are a second receiver, setup time, someone or something keeping it safe, and the need to know the coordinate of the point it sits on, which is its own problem. NGS's advice on siting is worth keeping: a spot with an open view of the whole sky is better than a well-known survey monument with trees around it.
The second way is to subscribe. A real-time network is a set of permanent reference stations, run by public agencies such as state transportation departments or by private companies, whose corrections reach the aircraft over the internet. The usual protocol is NTRIP (Networked Transport of RTCM via Internet Protocol), an open standard for streaming correction messages in the RTCM formats; the rover logs in to a server called a caster and picks a stream. NGS lists the advantages: no base to set up, half the equipment, and network software that models the atmospheric and orbit errors between stations, so centimeter positioning works more than 10 km (6 miles) from the nearest one.
NGS itself runs the NOAA CORS network, a nationwide set of continuously operating stations owned by hundreds of organizations, whose data NGS distributes free of charge. Those data are for processing after the fact, not a real-time service, and NGS has said it will not compete with the public and private real-time networks. A network needs an internet connection at the site, so the site walk includes checking the phone signal where the aircraft will take off.
Why distance to the base matters
Correction works because base and rover share their errors, and they share less the farther apart they are. The distance between them is the baseline. Over a long baseline the two signal paths cross different patches of atmosphere and see orbit errors from slightly different angles, so a leftover error remains after the shared part is removed. Equipment makers state it as parts per million of the baseline, usually 1 ppm, which is 1 mm for every kilometer. A common specification, quoted by NGS, is 1 cm + 1 ppm horizontal and 2 cm + 1 ppm vertical at one standard deviation.
The arithmetic shows when it matters. With a base on a 400 m square site, the farthest corner is under 0.6 km away, and the distance term adds less than a millimeter. With a base 20 km (12 miles) away it adds 2 cm, so the specification becomes 3 cm horizontal and 4 cm vertical before any other error is counted. Distance also makes the whole-cycle counts harder to resolve, so fixes take longer and are less reliable.
NGS's guidelines for a single base tie their tightest accuracy class (1 to 2 cm horizontal at 95 percent confidence) to baselines of 10 km (6 miles) or less, and allow 20 km (12 miles) for a class of 4 to 6 cm, while noting that newer equipment does better over longer lines. Those classes describe a surveyor's pole held still for seconds to minutes, not an aircraft moving at 8 m/s, so read them as a best case. A network gets around the limit by modeling the errors across its stations, which is why its users care less about the nearest station's distance than a single-base user does. Either way, know how far away the thing correcting you is.
Correct it now, or correct it afterwards
In real-time kinematic work (RTK) the corrections are applied as they arrive, and the aircraft records a corrected position with every photo. The answer exists before the aircraft lands, and the pilot can watch the solution status during the flight. The price is that the correction link has to hold for the whole flight, from a local base's radio or from a network over the internet. When it drops, the aircraft cannot stay fixed, and the photos taken during the gap carry float or worse positions.
In post-processed kinematic work (PPK) nothing is sent during the flight. The aircraft's receiver and the base each record their raw satellite measurements, and afterwards software combines the two logs. A dropped link costs nothing because there is no link. The software has the whole record at once and can be run again with different settings, and the base data can come from a station of the NOAA CORS network, downloaded after the flight; most of those are archived within 30 minutes past the hour, though some arrive only the next day.
Each fails in its own way. RTK fails in the field, visibly: no phone signal at the site, or a radio blocked by a hill or a tree line, and the status on the controller says so while there is still time to react. PPK fails quietly: a base that was never switched to logging, a log that stopped early, a station too far away or with a gap in its file, and you find out at the desk, miles from the site. Nor is post-processing automatically the more accurate of the two. A 2026 study that checked both against a robotic total station (a surveying instrument that tracks a moving target) found them comparable when signal conditions were good, while its post-processed solution stayed in float longer after the signal was disturbed, and the authors stress that processing settings change the result. Cheap insurance is to fly with RTK and log the raw data as well, so a flight with a dropout can still be rescued afterwards.
The base coordinate decides where the whole map lands
Every corrected position is the base's coordinate plus a measured vector. Whatever is wrong with the base coordinate is therefore wrong with every photo position, by the same amount in the same direction. NGS puts it plainly: the rover can never be more accurate than the base, and a mistake in setting up the base becomes a bias in every point measured from it.
The classic trap is to set a base on an unmarked spot and let it adopt its own uncorrected position, which is off by meters. The map comes out internally perfect, with true shapes, true distances and stockpile volumes unchanged, and the whole of it sits meters from where it belongs like hanging a row of picture frames by measuring each one from the first nail: if that first nail is in the wrong place, every frame is still perfectly spaced, and the whole row is off by the same amount. There are two cures. Set the base on a point whose coordinates are published, or let it record its raw data for the session and send that file to OPUS, NGS's free Online Positioning User Service, then move the base coordinate to the answer; NGS notes that doing this after the fact simply shifts every vector to start from the corrected base. OPUS accepts 15 minutes to 48 hours of static data, processes files of 2 hours or more against three CORS stations, and reports that under normal conditions most positions come out within a few centimeters. It cannot catch a wrong antenna type or antenna height, and NGS warns that the wrong antenna type alone can put the height off by as much as 80 cm.
The coordinate also has to be in the right datum. OPUS reports each position twice: in NAD 83 (2011) at epoch 2010.00, with NAVD 88 heights from the GEOID18 model and State Plane coordinates on request, and in the international reference frame (ITRF) at the date the data were collected. In the sample report NGS publishes (a mark in New Jersey, observed in 2022), the same mark's two sets of coordinates differ by about 1.2 m horizontally and 1.3 m in height; across the lower 48 states the gap is roughly 1 to 1.6 m. A network that broadcasts in one frame while the client wants the other produces a shift of that size, with nothing on screen to warn you. Ask the network which frame and epoch it uses; what separates those frames belongs to datums and ellipsoids.
As of late November 2026, NAD 83 (2011), the State Plane Coordinate System of 1983 and NAVD 88 (with GEOID18) are still the official US systems. Their replacements, NATRF2022 for positions and NAPGD2022 for heights among them, have completed their public beta feedback period but have not been approved, and no Federal Register notice of approval had been published. NGS plans to move OPUS onto them and says every latitude, longitude, ellipsoid height and elevation in the United States will change by as much as about 4 m, a nationwide ceiling it does not break down by place. Write down the datum, realization and geoid model of every job, so its coordinates can be carried across when that happens.
From the antenna to the camera, at the moment of the click
The receiver positions its antenna, or more exactly the antenna's phase center, the electrical point where the signal is effectively received. The photo needs the position of the camera, which hangs below the body on its gimbal. The fixed offset between the two is the lever arm. In one published build the antenna sat straight above the lens, 22.5 cm (about 9 inches) higher. Ignore that and every camera position is 22.5 cm too high. Tilt the aircraft 10 degrees into the wind and the offset also gains a horizontal part of about 4 cm, pointing wherever the tilt points. So the offset has to be measured in the aircraft's own frame and applied with the aircraft's attitude at each photo. Know where your setup stores that offset and check it once, rather than trusting that someone else did.
The second problem is time. The receivers record at a fixed rate (the base in one published setup logged five times a second), and the shutter fires somewhere between two records. The position at the moment of exposure is interpolated from the records around it, which needs an exact time stamp for the exposure: usually an electrical pulse from the camera's flash contact (the hot shoe), logged by the receiver as an event mark. There is also a lag between the command to take a photo and the middle of the exposure, the shutter delay. One study measured 0.42 seconds on a consumer camera system and calibrated it out.
The arithmetic is unforgiving. At the survey speed of 8 m/s (about 18 mph) the aircraft moves 8 mm every millisecond, so a timing error of 10 milliseconds puts each camera 8 cm along the flight line from where it really was, about three pixels at 2.5 cm per pixel. An uncalibrated delay of 0.42 seconds would be 3.4 m. The same study puts the requirement at about a hundredth of a second for camera positions good to a decimeter at 5 m/s. Because a timing error always points along the direction of travel, neighboring lines flown in opposite directions are pushed in opposite directions, a pattern worth recognizing when the camera positions disagree with the ground.
What corrected positions buy on the survey job
The job is a 400 m square of open ground, about 40 acres, that a contractor is about to grade. They want an orthomosaic, a bare-earth model good enough for 1-foot contours, and the volumes of two stockpiles. The quadcopter carries an RTK receiver taking corrections from a correction network, and it records a corrected camera position with each of its roughly 250 photos. Coordinates are delivered in NAD 83 (2011) State Plane for the site's zone, with NAVD 88 heights from GEOID18, so the network's frame has to be that one, or be converted to it before anything else happens.
Centimeter camera positions change how the map gets pinned to the ground. Without them, the processing leans entirely on marked points on the ground; with them, every photo arrives already carrying a good estimate of where it was taken, and far fewer ground marks are needed. Not none: published tests of aircraft-only positioning report 2 to 5 cm horizontal on checkpoints, while the vertical error varies from flight to flight, between 2 and 10 cm, and improves once even one ground control point is added. So the job keeps 5 ground control points and holds back 30 checkpoints; where they go and how many a job needs belongs to ground control.
The checkpoints gave 3.2 cm horizontal and 4.8 cm vertical root-mean-square error, and with the checkpoints' own survey error counted in, as the ASPRS standard requires, the reported accuracy came to 3.5 cm horizontal and 5.2 cm vertical, inside the 5 cm and 10 cm classes; how that is computed and reported belongs to accuracy assessment. Every failure on this page would have shown up in those numbers first: a base coordinate meters off, a network in the wrong frame, a lever arm left out, a shutter delay nobody calibrated, half the flight in float. And centimeter positions do not settle who may sign for the map: each state sets where licensed land surveying begins, and the line can take in topographic maps, volumes and statements of a map's accuracy, not only boundaries; this job is done under the responsible charge of a licensed land surveyor, who answers for the control, the checkpoints and the accuracy statement, while the pilot plans and flies the mission and processes the data.
Sources
The published studies, standards and guidance this page cites. Links open on other sites.
- User Guidelines for Single Base Real Time GNSS Positioning, Version 3.1, NOAA Manual NOS NGS 9 (NOAA National Geodetic Survey, 2014) geodesy.noaa.gov
- The NOAA CORS Network (NOAA National Geodetic Survey) geodesy.noaa.gov
- OPUS: Online Positioning User Service (NOAA National Geodetic Survey) geodesy.noaa.gov
- Historical CORS Coordinates and Helmert Transformation Parameters from the ITRS to NAD83 Reference Frames (NOAA National Geodetic Survey) geodesy.noaa.gov
- National Geodetic Survey Guidelines for Real Time GNSS Networks, Version 2.0 (NOAA, 2011) geodesy.noaa.gov
- A Test on the Potential of a Low Cost Unmanned Aerial Vehicle RTK/PPK Solution for Precision Positioning (Sensors, 2021) www.mdpi.com
- RTK and PPK GNSS Positioning Accuracy Assessment for UAVs Using a PPS-Synchronized Robotic Total Station (Sensors, 2026) www.mdpi.com
- New Datums: Replacing NAVD 88 and NAD 83 (NOAA National Geodetic Survey) geodesy.noaa.gov
- Track Our Progress, New Datums (NOAA National Geodetic Survey) geodesy.noaa.gov
- Evaluating the potential of post-processing kinematic (PPK) georeferencing for UAV-based structure-from-motion (SfM) photogrammetry (Earth Surf. Dynam., 2019) esurf.copernicus.org
- Low-cost DGPS assisted aerial triangulation for sub-decimetric accuracy with non-RTK UAVs (ISPRS Archives, 2021) isprs-archives.copernicus.org