Planning the mapping flight — study guide
The concept's fragments, read in order.
One file the aircraft can fly
A mapping flight is decided at a desk, or on a tailgate, before the aircraft ever leaves the ground. The autopilot's mission mode flies a stored list of waypoints and fires the camera where the list says, and that list is the mission. Nobody types it in point by point. Planning software builds it from a handful of choices: the boundary of the area, the height above the ground, the front and side overlap, the speed, the camera and its settings, and the spot the aircraft will take off from.
Each of those choices has its own concept and its own arithmetic. Camera geometry and ground sample distance turn a height into a pixel size, overlap turns a footprint into line and photo spacing, and the blur budget limits the speed. Mission planning is where they meet, and where they start to argue with each other: a lower height means more lines, more lines mean more minutes, more minutes may mean a second battery, and a second battery means a gap in the flight that has to be planned as carefully as the lines.
The shared job runs through this page. A contractor wants an orthomosaic, a bare-earth elevation model with 1-foot contours and two stockpile volumes from a square parcel 400 m (about 1,300 ft) on a side, 16 hectares or about 40 acres. The ground rises 14 m (46 ft) from the low southwest corner to the high northeast corner, trees line the west edge, and a public road runs along the south edge. The aircraft is a quadcopter of about 1.4 kg (3 lb) with a 20-megapixel camera pointing straight down, flying at 300 ft (91 m) above the ground under a LAANC authorization for exactly that height.
The flight rules quoted here are those of the United States, where the FAA's Part 107 governs drones flown for work; other countries have their own rules and regulators. Those rules leave the plan to the pilot and hold the pilot responsible for it. The software will happily draw a mission that flies over the road, beyond sight, or past the end of the battery, so the last part of planning is reading what it drew.
From six choices to eleven lines
A survey mission is a back-and-forth pattern of parallel flight lines, like mowing a lawn in straight stripes, each pass overlapping the last by a fixed amount, and every number in it falls out of the choices the pilot makes. On the shared job the chain runs like this. The camera at 300 ft (91 m) above the ground gives a ground sample distance of 2.5 cm (about an inch) and a photo that covers 137 m across the line by 91 m along it. A side overlap of 70 percent puts the lines 41 m apart; a front overlap of 75 percent puts a photo every 23 m along each line. At 8 m/s (about 18 mph) over the ground, 23 m comes round every 2.9 seconds, so the camera fires roughly every three seconds.
The area turns spacing into counts. Across 400 m, lines 41 m apart need eleven lines to cover both edges, and at a photo every 23 m each line takes nineteen photos over the parcel and two more past each end, twenty-three in all: about 250 photos for the job. With those runs past the edges each line is about 490 m, so the eleven lines come to about 5.4 km, about 11 minutes at 8 m/s; the turns between lines, the climb, the trip out, the trip back and the landing make it about 14 minutes from takeoff to landing. The planning software prints these as its statistics, and they are the numbers the rest of the plan is checked against.
The chain also shows what moves when a choice moves. Fly lower and the pixel shrinks, the lines close up and the line count grows, so photos and minutes grow faster than the detail does. Raise the overlap and the same thing happens without the extra detail. Fly faster and the minutes fall, but the photo interval shortens toward what the camera can keep up with, and the blur per photo grows: at 8 m/s and a shutter of 1/1000 s the camera moves 0.8 cm during each exposure, about a third of a pixel, and twice the speed would make that two thirds.
The takeoff point is the one choice that sets no spacing at all, and it still shapes the mission. It decides what every height in the mission is measured from, how far away the far corner is, and which way the aircraft has to fly to get home, which is why it is chosen with the site in front of you rather than wherever the truck stopped.
Above the ground, not above the takeoff
The aircraft knows its height from the point where it took off. Its barometer is zeroed there, and an ordinary mission's heights are written relative to that home point. The camera does not care about the home point. Pixel size, footprint and overlap all depend on the height above the ground directly under the camera, and so do the FAA's 400 ft limit and the job's 300 ft authorization. On flat ground the two heights are the same number. On a slope they are not, like measuring every ceiling in a house built on a hillside from the front doorstep, rather than from the floor of each room.
The shared site rises 14 m (46 ft) from the low southwest corner to the high northeast corner, and the takeoff point is near the high corner. Fly the whole mission at one height above home and that height is capped by the low corner: the authorization allows 300 ft above the ground there, and the low corner is 46 ft below home, so the flat mission sits at 254 ft above home. Over the high ground it is then only 254 ft (77 m) up. The pixel shrinks from 2.5 cm to about 2.1 cm, the footprint narrows from 137 m to about 116 m, and lines spaced 41 m apart for a 300 ft flight keep only about 65 percent side overlap where 70 was planned. The detail is finer than anyone asked for and the overlap is thinner than the plan promised.
Terrain following removes the trade. The mission's heights are set so that the aircraft stays 300 ft above the ground under every waypoint: 300 ft above home over the high corner, sinking to 254 ft above home over the low corner. Every photo is taken at 2.5 cm, every line keeps its planned overlap, and the aircraft never passes 300 ft above the ground anywhere on the site.
The slip that breaks a rule is a height typed as if it were above the ground when the aircraft will read it as above home. Enter 300 ft for a flat mission launched near the high corner and the aircraft flies 346 ft (105 m) above the ground over the low corner, 46 ft past the authorization, with its pixel there grown to about 2.9 cm and nothing on the controller's height display looking wrong. A height is only a number until you know what it is measured from.
Where the terrain comes from
To follow the terrain, the planning software has to know the terrain before the flight, so it reads ground heights from an elevation model, a grid of elevations covering the site. In the United States the public choice is the USGS 3D Elevation Program, whose seamless national model has a cell about 10 m across, with 1 m data over a growing but still partial share of the country; a client's earlier survey of the same site can be better still. One open-source autopilot's own terrain server is far coarser, with points 100 m apart and a typical error its documentation puts around 10 m, which is why that documentation calls terrain following suitable for aircraft flying at 60 m or more. The arithmetic is the same either way: find the ground under each point of the line and add the chosen 300 ft. Some planners write the results into the mission as heights relative to home, with extra waypoints along each line so that the height follows the slope instead of jumping from one end to the other; others hand the terrain grid to the aircraft and let it hold its height above the grid itself.
Heights written relative to home are only right if home is where the planner assumed, and the planner has to guess. An open-source planner asks you to drag the planned home to where you intend to take off and reads its elevation from the same terrain data, while the aircraft sets its actual home wherever it is when the motors arm. Launch from a spot 3 m lower than the one planned and every waypoint flies 3 m lower over the ground; launch from the low corner of the shared site with a plan made for the high corner, and the whole mission sits 14 m (46 ft) closer to the ground than planned. Take off where the plan says, or plan again.
The elevation model also has limits of its own. A bare-earth model has no trees and no buildings in it, so a 300 ft margin over the ground is not a 300 ft margin over the tree line along the west edge, and on a construction site the ground itself may have changed since the model was flown: a stockpile that was not there last year stands taller than the model knows. A 14 m slope over 400 m is gentle, and a 10 m grid catches it easily. What it cannot catch is anything it never saw, so the pilot checks the terrain profile the software draws against the site walk before trusting it.
Flight time, packs and swaps
The planning software prints an estimated flight time, and the pilot turns it into a number of packs. Part 107 requires only that there be enough available power for the intended flight; the reserve is the operator's own rule, and on the shared job it is to land with at least 30 percent left. A pack rated for about 30 minutes in still air therefore offers 21 rated minutes of work. Plan for a bad day, where wind, cool air and an older pack make the aircraft draw half again as much power as the rating assumes, and those 21 rated minutes buy 14 minutes of flying. The job's mission takes about 14 minutes from takeoff to landing, so it fits on one pack, with the reserve intact on the bad day and nothing beyond it.
A site twice the size does not fit. At the same height, overlap and speed, a parcel 800 m by 400 m needs 21 lines instead of 11 and about 25 minutes from takeoff to landing, so it becomes two flights. The clean way to split it is into blocks of whole lines, each block flown on its own pack, with the two blocks sharing at least one line so that the photos on either side of the join still overlap the way the processing needs. Some planning software does the split itself and shows where the change falls; one open-source planner can also resume an interrupted mission after a pack change, rebuilding it from the last waypoint the aircraft flew through. A resume is a recovery, though, and a mission split into blocks before the day is a plan.
The join is where a split dataset goes wrong. Fly the second block from the same takeoff point, because every height in it was measured from there, or plan it again for its own point. Keep the height, the overlap, the camera settings and the line direction identical, so the two halves look like one dataset. And fly them back to back: shadows move and clouds come and go, and a block flown two hours later can look different enough to show in the finished map. A swap is quick when the charged, warm packs are already lined up beside the takeoff point, and slow when somebody has to go and find them.
Which way to run the lines
A mapping mission is planned as a speed over the ground, because photo spacing depends on it, and the wind decides what that costs in speed through the air. On the job day the report reads a west wind of 8 knots gusting 15, and the common power-law estimate makes that about 6.4 m/s (12 knots) at 300 ft, with gusts that could reach about 12 m/s. Run the lines east and west and they alternate. Flying west, into the wind, the aircraft needs about 14 m/s through the air to make its 8 m/s over the ground, and about 20 m/s in a gust; flying east it needs only about 1.6. Every other line is the hardest flying of the day, and a gust on one of them may ask for more speed than the aircraft has.
Run the lines north and south instead and the wind comes from the side on every line. A multirotor holds its track by leaning partly into the wind, like a rower crossing a river who points the bow a little upstream and pulls equally hard on every crossing, while its gimbal keeps the camera square to the ground, so the photos keep their spacing and their alignment with the line. The speed through the air is about 10 m/s on every line, about 14 m/s in a gust: the same moderate load north and south, and a worst case well short of the into-wind line's. On this day, for this aircraft, the arithmetic favors lines across the wind. Published practice advice points both ways, some favoring lines across the wind for a steady speed and some favoring lines along it to avoid sideways drift, so treat the choice as a calculation for the day rather than a rule. A fixed wing, which has to point its nose and its camera partly into a crosswind, weighs the same choice differently.
Line direction has to fit the site as well as the wind. North-south lines end at the road along the south edge, so the two photos each line takes past that edge, and the turn after them, put the aircraft over the road. Part 107 does not let this aircraft fly over people in moving vehicles, so the observer stands where the road can be seen and the pilot holds the aircraft short of the edge whenever traffic is coming; on a road too busy for that, the south run-past is dropped and the turns are planned inside the boundary. The westernmost line runs beside the tree line. The trees, about 15 m (50 ft) tall, stand well below an aircraft at 300 ft, but that line is also the one farthest from a pilot standing near the northeast corner.
Order matters as much as direction. The takeoff point is near the northeast corner, downwind of most of the site. Start the mission at the far western line, so the trip out into the wind happens on a full pack and the far lines are flown, and seen, first; then step east, line by line, toward home. The mission ends a short downwind hop from the landing spot, which is where an aircraft at the end of its pack belongs.
566 meters to the far corner
The takeoff point on the shared job sits on open ground near the high northeast corner, chosen so that a return-to-home height of 254 ft above it never carries the aircraft past 300 ft above the ground. That choice has a price. The far corner is 566 m (1,860 ft) away, and over it the aircraft is about 77 m above the pilot's own ground, so the pilot is looking at something about 570 m off and less than 8 degrees above the horizon. Part 107 sets no distance for visual line of sight. Section 107.31 asks that the pilot, the person on the controls and any visual observer be able to see the aircraft, with no aid but glasses or contact lenses, well enough to know where it is, tell its attitude, height and direction of flight, watch the sky around it and judge that it endangers no one. The FAA's advisory circular adds the plain consequence: the aircraft must be flown close enough for that to be true.
At 566 m that is a real question for an aircraft of 3 lb. In a 2019 field study, 32 people on the ground rated whether they could see a camera quadcopter of about this aircraft's weight hovering at one of 32 set points; the authors' fitted model put the distance at which half the answers would be "definitely" or "probably" yes at 245 m, and the chance at 300 m at about three in ten. Another study found the aircraft's size and the observer's eyesight the most important factors. Detecting a dot is also less than the rule asks, which is reading which way it is pointing and whether it is climbing. A pilot who has followed the aircraft out from takeoff and knows where to look may well do better than those observers, but the far corner of this site is more than twice the study's halfway distance, and good eyesight there cannot be assumed.
So the pilot checks before committing. The mission starts on the far western lines, and on the first of them the pilot asks the honest question: can I still tell its attitude and direction, with the sun where it is and the sky behind it? A morning flight helps here, because the sun is then in the eastern half of the sky, away from where the pilot looks while the western lines are flown. The visual observer helps the pilot watch but cannot stretch the distance, because the rule requires the pilot and the person on the controls to remain able to see the aircraft too. If the answer is no, the pilot pauses the mission and brings the aircraft closer, and the plan changes, not the rule.
One workable change is to split the site along the diagonal from the northwest corner to the southeast corner and fly the far half from a second takeoff point at the middle, which is no more than 283 m (930 ft) from any corner. If the slope is even, the middle sits on the highest ground of that far half, 23 ft above the low corner, so the same arithmetic gives a return height at or below about 277 ft above the new home point; check it against the real profile from the site walk, and plan the far half's heights from its own takeoff point. A plan that never asks the pilot to see 566 m is better than one that hopes they can.
Reading the plan before it flies
The planning software draws whatever it is told to draw, so the pilot reads the result as a skeptic would, one question at a time. Start with the map. Does the pattern cover the whole parcel with its runs past the edges, and do those runs and the turns at the ends of the lines stay inside the space the flight may use? On the shared job the runs past the south edge, and the turns after them, cross a public road, and the west edge is a tree line; the south turns are where a mission quietly ends up over traffic, so the plan for holding short when a vehicle comes is part of this check.
Then the heights. The authorization on this job is 300 ft above the ground, and the mission follows the terrain, so the check has two halves: no waypoint above 300 ft over the ground beneath it, and heights above home that run from 300 ft over the high corner down to 254 ft over the low one. The terrain profile the software draws should look like the site walk, with no ridge or hollow nobody saw. The return-to-home height and the lost-link action, chosen with the emergency plan, belong in this check too, because the mission and the failsafe share the same sky: on this site a return height at or below 254 ft above home.
Then the numbers the software prints. About 250 photos, a photo roughly every three seconds, lines 41 m apart, 2.5 cm pixels, and about 14 minutes from takeoff to landing, which is all one pack can be trusted with on a bad day under the job's 30 percent landing reserve. A count far off those figures means a setting is wrong: a camera model picked from the wrong list, overlaps swapped, the speed in miles per hour where meters per second were meant. The camera itself is set the way the plan assumed, with the exposure locked to the shutter speed the blur budget allows and the trigger set by distance.
Last, the aircraft. Upload the mission, read it back from the aircraft, and compare the two. Check on the controller that the home point has been recorded where you are actually standing, the spot the heights were planned from. Under Part 107 the remote pilot in command is the final authority on the flight, and the advisory circular expects the pilot to be able to change the route or land at once during an automatic flight; knowing which switch does that on this controller is part of the plan, not an afterthought.
Checking the photos before you drive away
The most expensive photo on a survey is the one that was never taken. Discovering the gap at the processing workstation, the next day and an hour's drive away, means another trip, another authorization window, and a second dataset flown in different light. Discovering it on site means one more short flight. So before the packs go back in the case, the crew checks the card, which takes minutes and is a habit of good practice rather than anything a rule requires.
First the count: about 250 photos planned, about 250 on the card. A shortfall of a dozen is a camera that skipped triggers or a line cut short. Plot the photos' recorded positions on a map of the site and the gap shows itself: a hole in the pattern, or a line with a stretch of missing frames, is the thing to find now.
Then a look at the pictures themselves. Open a handful from different lines, including the far western lines and the last ones flown, and zoom to full size. Fine texture on the ground should be crisp; a smear along the direction of flight is blur, a sign that the shutter speed slipped longer than planned. Check the exposure too, with no washed-out white ground and no shadows gone black, and check that each ground mark shows clearly in the photos over it, since a mark nobody can find in the photos measures nothing.
Last, the positions. Each photo's metadata should carry a position and, on an aircraft that records it, the status of the satellite correction when the photo was taken. A run of photos tagged float instead of fixed means the aircraft lost its centimeter-level correction somewhere over the site, and those camera positions may be off by anything up to a few meters instead of a few centimeters. The processing may survive it with ground control, but the pilot should know before leaving whether it has to, and whether a second pass over that stretch is the cheaper fix.
The mission is the first deliverable
Every product the contractor receives is built from the photos this mission took, and every one of them inherits the mission's decisions. The orthomosaic's 3 cm pixel follows from the 2.5 cm the height chose, since the ASPRS guidance wants the photos' pixel no more than 95 percent of the delivered one. The elevation model behind the 1-foot contours is only as complete as the overlap the lines kept over the high ground. The stockpile volumes depend on photos of both piles from enough directions, and the accuracy statement at the end of the job, measured at the checkpoints, can be no better than the pattern and the positions the flight delivered. Processing can repair a great deal, but it cannot invent a photo that was never taken.
Written down, the plan for the shared job is short. One automatic mission over the 16-hectare (40-acre) parcel, eleven north-south lines 41 m apart, each run two photos past both ends, flown at 8 m/s and 300 ft above the ground with the terrain followed, about 250 photos at 2.5 cm. Takeoff and landing on open ground near the high northeast corner, with a return height at or below 254 ft above it. The far western lines flown first, on a full pack and across the wind, with the pilot confirming that the aircraft can still be read at the far corner, and a second takeoff point at the middle of the site held ready if it cannot. About 14 minutes on one pack, landing with more than 30 percent left. Then the card checked before anyone drives away.
Nothing in that plan is clever. It is the arithmetic of the neighboring concepts, put in one place and checked twice, once before the aircraft flies and once before the crew leaves. That is why it pays: a mission checked on the ground costs a few minutes, and a mission discovered wrong in the office costs another day on site, and sometimes a map that quietly does not meet the accuracy it claims.
Sources
The published studies, standards and guidance this page cites. Links open on other sites.
- 14 CFR Part 107, Small Unmanned Aircraft Systems (Electronic Code of Federal Regulations) www.ecfr.gov
- Survey (Plan Pattern), QGroundControl Guide (open-source ground control software) docs.qgroundcontrol.com
- About 3DEP Products and Services (U.S. Geological Survey) www.usgs.gov
- Terrain Following, ArduPilot Copter documentation (open-source autopilot) ardupilot.org
- Plan View, QGroundControl Guide (open-source ground control software) docs.qgroundcontrol.com
- Fly View, QGroundControl Guide (open-source ground control software) docs.qgroundcontrol.com
- LLLJP Wind Shear Formula (Power law) (NOAA Chemical Sciences Laboratory) www.csl.noaa.gov
- Pilot's Handbook of Aeronautical Knowledge, Chapter 16: Navigation (FAA) www.faa.gov
- Advisory Circular 107-2A, Small Unmanned Aircraft System (Small UAS) (FAA, 2021) www.faa.gov
- Line-of-sight in operating a small unmanned aerial vehicle: How far can a quadcopter fly in line-of-sight? (Applied Ergonomics, 2019) www.sciencedirect.com
- Estimating Drone Visual Line-of-Sight Distance Using Machine Learning Approaches (Aerospace, 2024) www.mdpi.com
- ASPRS Positional Accuracy Standards for Digital Geospatial Data, Edition 2, Version 2 (ASPRS, 2024) my.asprs.org